ParticuliersEntreprises
← All insights

Six Things Worth Knowing Before You Sign a Lease

Connecten Business provides unlimited business-grade cellular internet for small businesses across the US and Canada. Use it as your primary connection, as automatic failover alongside an existing line, or on demand for short-term needs. No contract, no credit check, plug and play setup, and a 14-day money-back guarantee. Learn more at connectenbusiness.com.

August 29, 2026

The lease is the first thing that locks in and the last thing you can change.

You can adjust your prices, change your hours, swap suppliers, hire and let go, rebrand entirely. All of that stays flexible. But once you've signed a three or five year commercial lease, the location, the monthly cost, and most of the constraints on how you operate are fixed for the duration.

Which means the weeks before you sign carry more weight than almost any other period in the life of the business. And most first-time tenants spend those weeks focused on the wrong number.

Here's what's worth knowing.

1. The landlord quotes rent. The previous tenant quotes reality.

Rent is the number in the listing, and it's rarely the number you'll actually pay each month.

Depending on the lease structure, you may also be responsible for property taxes, building insurance, common area maintenance, water, sewer, trash, and your own utilities. In a triple net lease, most of that is on you, and those costs move independently of your rent.

The base rent might be predictable. A heating bill in an uninsulated space with fifteen foot ceilings is not.

Before signing, ask directly what the utilities have run historically. Ask the landlord, and then, if you can find them, ask whoever occupied the space before you. Previous tenants have no reason to soften the number and they'll often tell you things the listing agent wouldn't volunteer. If the space has been empty for a while, ask why. Sometimes the answer is the market. Sometimes it's the winter gas bill.

Build your model on the full monthly cost of occupancy, not the rent figure. The gap between the two is where a lot of first-year budgets quietly break.

2. What's behind the walls decides your layout, not your drawings

It's easy to walk into an empty space and start placing things. Counter here, kitchen there, restrooms in the back corner.

Then you find out where the plumbing actually runs, where the electrical panel sits and what capacity it has, whether there's gas service, whether the floor can be trenched, and whether the ventilation can be routed anywhere useful. Suddenly the layout that made sense on paper costs sixty thousand dollars to build because you're moving a drain line across a concrete slab.

Before you commit, get someone who actually knows to look. A contractor, an architect, or a tradesperson familiar with the kind of buildout you have in mind. A few hundred dollars for a walkthrough is trivial against the cost of discovering a problem after you've signed.

Ask specifically about electrical capacity, plumbing locations and stack positions, HVAC condition and age, whether the space is sprinklered, and what the path is for any venting you'll need. If you're doing food service, ask early about grease interceptors and exhaust routing, because those two items sink more restaurant buildouts than any other.

Also worth asking: what does the city require to change the use of this space? A permit process you didn't anticipate can add months.

3. Negotiate the free rent period, not the rate

New tenants tend to focus their negotiating energy on the monthly rate, because it's the number they've been comparing across listings. Landlords are usually reluctant to move much on rate, partly because it sets a benchmark for the building.

What they're often far more flexible on is time.

A free rent period, sometimes called a build-out period or rent abatement, gives you months at the start of the lease where you're not paying while you get the space ready. Two or three months of that is worth substantially more to you than a small reduction in the monthly rate, because it lands exactly when your costs are highest and your revenue is zero.

Also worth negotiating: a tenant improvement allowance, where the landlord contributes to the buildout. An option to renew at a defined rate, so a successful business doesn't get repriced out of its own location. A cap on annual increases. And an assignment or sublease clause that lets you transfer the lease if you need to exit, which is the single most valuable protection a first-time tenant can get and the one most often overlooked.

Have a lawyer read it. Commercial leases are written by the landlord's counsel and they are not neutral documents. A few hundred dollars of review can catch a personal guarantee clause that puts your house behind a business that hasn't opened yet.

4. Check the parking at the hour you'll actually be open

Visit at the time your customers will visit.

A block that's empty at ten on a Tuesday can be completely full at six on a Thursday. A space with generous parking can share that lot with a gym, a church, or an office building whose peak hours are exactly yours. Street parking that looks abundant might have two hour limits, permit restrictions, or a cleaning schedule that removes it twice a week.

Go at your actual operating hours, on the days you expect to be busiest. Sit there for half an hour. Watch how people move through the block, which direction they walk from, whether they pass your door or turn before it.

The same applies to foot traffic generally. Retail and food businesses live on the specific patterns of a block, and those patterns are invisible in a daytime walkthrough with an agent. Corner positions, the side of the street that gets afternoon shade, the direction people walk from the parking structure. All of it matters and none of it appears in the listing.

5. Assume it opens three months late and costs a third more

This is not pessimism. It's the base rate.

Permits take longer than the city estimates. Inspections get scheduled further out than you'd like. Contractors run over. Equipment arrives late or arrives damaged. Something behind a wall turns out to be different from what was expected. Any one of these adds weeks, and they tend to arrive in sequence rather than all at once.

Plan your runway against the delayed timeline, not the optimistic one. Specifically, make sure you can cover rent, loan payments, and living expenses through a period where the space is costing you money and producing none.

The businesses that get into trouble in year one are frequently not the ones with a bad concept. They're the ones that opened with no cash left, because the buildout consumed the reserve that was supposed to carry them through the slow first months. Opening day is not the finish line. It's the point where you start needing working capital.

6. Check what internet actually reaches the building

This is the item most often left until the week before opening, when it becomes urgent and there are no good options left.

Not every commercial building has decent wired service. Older buildings, converted industrial spaces, standalone structures, and rural or semi-rural locations frequently have limited options, long install timelines, or nothing usable at all. Providers will quote coverage at an address that turns out to mean something different in practice.

Before you sign, ask what's actually available at that specific address, not the block. Ask what the install timeline is. Providers routinely quote several weeks, and in some cases they'll need to run a line, which turns into a permitting and construction question with its own schedule.

Think about what you'll depend on. Point of sale and card processing. Online ordering. Booking and scheduling. Security cameras. Phones, if they're VoIP. Inventory systems. Increasingly, thermostats, door locks, and kitchen equipment. Most of that runs over a single connection, and if that connection isn't available or isn't reliable, you have a problem that no amount of buildout budget will fix.

This is the one item on this list that doesn't have to be solved before you sign.

Connecten Business is unlimited business-grade cellular internet built for exactly this situation. One device reaches every major network in the US and Canada, so what the building was wired for stops being the deciding factor. It arrives ready to use, installs in minutes without a technician visit, and can be running on the day you get keys rather than several weeks after.

You can run it as your primary connection, which is often the right answer in buildings where wired service is poor or unavailable. Or as failover alongside a wired line, taking over automatically the moment that line drops. No contract, no credit check, and a 14-day money-back guarantee.

If the space is right and the connectivity is the only thing giving you pause, that's a solvable problem.

Before you sign

A short version of the above, in the order you'd actually do it.

Walk the space at your operating hours, not the agent's. Bring a contractor before you bring a lawyer, because what's behind the walls determines whether the deal is worth negotiating at all. Ask the previous tenant about the utility bills. Check what internet reaches the address. Then negotiate for time and flexibility rather than for rate. Then have a lawyer read every page, particularly anything resembling a personal guarantee.

And build your budget on the assumption that it takes longer and costs more than anyone is telling you, because it will.